THE PROJECT
Head contract construction of composting tunnels and the associated infrastructure for a regional organics processor, with the design and documentation prepared in house and Silverfox Management building the works. Construction is under way.
The scope takes in the tunnel structures, site earthworks and hardstand, and the services and process infrastructure the plant needs to operate. Designing and building in the one office kept the process requirements and the buildability of the structures aligned throughout.
SCOPE HIGHLIGHTS
1. Composting tunnels and process infrastructure
2. Design and documentation prepared in house
3. Head contract construction
4. Site earthworks, hardstand and services
IN THE NEWS
“Tim King from build-stage site manager SilverFox Management said construction had progressed on schedule with strong participation from local contractors.”
“Construction is being led by SilverFox Management, with works undertaken by Bendigo and surrounding regional contractors, including Wild Plumbing, Made Electrical, Stateform Concrete, Newform Precast, Hadden Farren Group and Weldone Steel.”
“Construction is being delivered by SilverFox Management alongside Bendigo-based trades and contractors.”